Campus for Future Living

Campus for Future Living is a new initiative based in Lincolnshire, UK, dedicated to supporting the local community through collaboration with partners from the healthcare, academic and business sectors. With a strong focus on wellbeing, innovation and sustainability, the Campus is designed as a flexible space that can evolve in line with the needs of future generations.

As part of a significant new build project, Dextra Group was appointed to supply the lighting system for the initial shell and core phase. Thanks to their exceptional service, product quality and close partnership with Selmec, the electrical contractor, Dextra was retained to continue delivering lighting solutions for the subsequent phases of the project.

The nature of the new Campus building required a versatile lighting system, capable of adapting to a wide range of uses and environments within the space. From general circulation areas to more focused zones such as meeting rooms, each space had distinct requirements for both functionality and comfort.

Dextra’s ability to provide a flexible, end-to-end solution was key to meeting the project’s varied demands. Within the meeting areas, Dextra installed its Reacta control system, enabling multiple lighting scene settings tailored to the needs of the users. This intelligent control system allows lighting levels to be adjusted according to activity, ensuring a dynamic and comfortable environment at all times.

Dextra played a key role in supporting Campus for Future Living’s mission to provide a modern, community-driven facility. This project underlines Dextra’s continued commitment to delivering sustainable, people-focused lighting solutions that align with the evolving needs of both clients and end users.

“Once again, we have received phenomenal service from Dextra at both a local level and via their head office. Dextra worked with Selmec to provide the initial client with a base build style lighting solution, prior to a tenant being found for the property. When Selmec were awarded the fit-out package, we immediately instructed Dextra to provide a few design lead concepts that the client could select. Once they had selected their preferred option, deliveries were seamless and very quick and commissioning of the controls system very easy to arrange. The products were excellent value for money and of the high quality that we have come to expect from Dextra.”

Richard Beck – Contracts Manager

dextra-group-wht
(+44) 01747 858100
(+44) 01747 858100